Petrochemical

Harbour Transfer Lines, Cape Town

By kanteys_admin / November 4, 2019 /

The project consists mainly of the installation of three new transfer pipelines (26” Crude, 10” Black Oils, and 12” White Oils) in the Cape Town Harbour. Each pipeline measured approximately 650 m in length and ran between the tanker berths in the harbour and the pump station in the ballast area. The project included the…

Read More

Airport Fuel Depot Upgrade, Cape Town

By kanteys_admin / November 4, 2019 /

This project includes the construction of two 3200m³ above ground jet fuel storage tanks and supporting infrastructure as well as the upgrading of the existing infrastructure to support the new installation. Mechanical infrastructure was upgrade to increase the throughput of the depot and included an additional two road receipt pumps together with filters and metering,…

Read More

Walvis Bay Depot Project Namibia

By kanteys_admin / October 15, 2019 /

Install new pumps in new pump bay (2 x road for ULP, 2 x road for 500ppm diesel and 2 x Road for Diesel 50, 2000l/min each). Install new discharge piping from new pump bay to new road gantry for each product. Install new loading equipment (2 x bays only) in the new road gantry.…

Read More

Lumwana Mine Depot Project Zambia

By kanteys_admin / October 15, 2019 /

Construction of road receipt facilities, consisting of concrete spill slab, structural steel gantry with high level fall protection and canopy roof to cater for receipt of diesel and 2x lube oils. Construction of tankage and bunds to cater for 2x 500cu.m diesel tanks and 2x 46cu.m lube oil tanks, including associated fixed and mobile fire…

Read More

Kansanshi Mine Depot Project Zambia

By kanteys_admin / October 15, 2019 /

Construction of 2 road receipt facilities servicing diesel and lube oils, which consists of concrete spill slab, structural steel gantry with high level fall protection and canopy roof. Construction of 5 bay HME loading facilities for diesel and lube oils, consisting of concrete spill slab, structural steel gantry and canopy roof. Construction of 2 bay…

Read More

Kalumbila Mine Depot Project Zambia

By kanteys_admin / October 15, 2019 /

Construction of 3 bay road receipt facility for diesel and lube oils, which consists of concrete spill slab, structural steel gantry with high level fall protection and canopy roof. Construction of a 3 bay HME loading facility for diesel and lube oils, consisting of concrete spill slab, structural steel gantry and canopy roof. Construction of…

Read More