The project involved the investigation of the reseal/pavement rehabilitation and upgrade of Trunk Road 31 Section 5 (TR 31/5) from Ladismith (km 0.91) to Calitzdorp (km 47.63) including initial and detailed assessment, detail design and documentation as well as the tender and construction stages. The project included the following works: Pavement repair work and reseal using…
Read MoreThe work completed under the contract consisted mainly of the resurfacing of a portion of Trunk Road 1 section 1 between km 6.4 and km 19.5 (Outeniqua Pass) near George. The existing porous asphalt milled and replaced it with an Ultra-Thin Friction Course (UTFC).
Read MoreThe Union Street Link project was undertaken for George Municipality and consisted of two separate but related elements. The first element was a proposed north-south crossing under the existing George-Mossel Bay railway line in the vicinity of Union Street and Rand Road and the second was an east-west extension of Hope Street – in order…
Read MoreThe project consisted of the rehabilitation of 3,32 km of Noordhoek Road (MR103) including geometrical improvement to the Silvermine Road and Houmoed Road intersections. The pavement rehabilitation involved the cold in-situ recycling of the existing base to a depth of 200mm and the subsequent placing of a 40mm continuously graded asphalt surfacing. Part of the…
Read MoreThe project was located near Melkbosstrand and covered the 25km of the R27 (Westcoast Road) and approximately 7km the M19. The main objective of this project was the resurfacing of roads and the upgrading of three intersections. Rehabilitation works to two bridges were also included under the project.
Read MoreThe upgrade of this Gautrans and JRA intersection involved extensive road widenings, new slip lanes, relocation of services and infrastructure upgrade. This project formed part of the bigger precinct development along Monte Casino Boulevard.
Read MoreThe project entailed the rehabilitation of some 9 km of surfaced roads and the upgrade of the existing gravel roads to a surfaced standard. The project was located near Glentana in the Western Cape. Also included under the contract were the construction of some 7 km of surfaced sidewalks, construction of two major gabion revetment…
Read MoreThe project entailed the remediation of the existing rock cut slopes and concrete catch-walls in the Huis River Pass on Route 62 between Ladismith and Calitzdorp. The work included the barring down of potentially unstable material from the existing cut slopes and the removal of the rock build-up behind the catch-walls – some 23000m 3…
Read MoreThe project comprised flood damage repairs near Botlierskop in the Southern Cape. The road works included the construction of a concrete causeway. The river works involved the construction of groynes on the embankment of and in the Moordkuil river, river bank excavations and fill and placing of rip-rap on the riverbank slope.
Read MoreThe project involved the reconstruction and upgrading of 4,1 km of N9/N12 between George and the Outeniqua Pass in the Western Cape. The widening and raising of the Malgas river arch bridge and the diversion of a short section of the Blanco river also formed a key component of the project. Extensive provision was also…