In keeping with international development trends, South Africa has capitalised on its inherent natural attributes and become home to a number of exclusive residential golf estates. Kantey & Templer has, together with a host of complimentary development professionals, provided input into many of these developments around the country. Services provided by K&T have included geotechnical,…
Read MoreKantey & Templer conduct contamination assessments at sites during the removal of underground storage tanks, which were utilised for the storage of fuel or solvents. K&T determine whether any residual contamination may be present as a result of fuel storage on site. The site investigation generally consists of the following scope of work: Site and…
Read MoreKantey & Templer has been involved in Department of Public Works Projects where we conducted Environmental Impact Assessments and implement an Environmental Management Plan (EMP) for the construction of a bulk water supply systems and other potable water systems. As part of these appointments K&T also provided an Environmental Control Officer who inspected the construction…
Read MoreKantey & Templer can conduct site assessments to fully establish the contamination status of sites prior to acquisition by the client. This is generally done by adopting a three-phase approach; Phase 1, Phase 2 – and Tier 2 assessments. Additionally, for the sites where unacceptable risks were identified, site-specific, remedial targets are developed to protect…
Read MoreKantey & Templer regularly undertake Basic Assessment processes for the replacement of underground and aboveground storage tanks. From the application, to public participation, to construction phase management of compliance to post-construction auditing following completion of the project.
Read MoreLeaking infrastructure and significant spillages may result in Free Phase Product (FFP) forming in the subsurface (soil and groundwater). FPP may also be encountered aboveground in areas such as streams, drains, etc. Unrecovered FPP will directly lead to secondary contamination sources. Vacuum-Enhanced Recovery (VER) is an in-situ technology that uses pumps to remove various combinations…
Read MoreThe project consists mainly of the installation of three new transfer pipelines (26” Crude, 10” Black Oils, and 12” White Oils) in the Cape Town Harbour. Each pipeline measured approximately 650 m in length and ran between the tanker berths in the harbour and the pump station in the ballast area. The project included the…
Read MoreThis project includes the construction of two 3200m³ above ground jet fuel storage tanks and supporting infrastructure as well as the upgrading of the existing infrastructure to support the new installation. Mechanical infrastructure was upgrade to increase the throughput of the depot and included an additional two road receipt pumps together with filters and metering,…
Read MoreFor the Firefighting upgrade, the electrical works consisted of the fire pump controllers and distributed fire control panels to operate the 9 pumps and the 50 deluge valves. The control system consisted of a SANS 60054 compliant controller. K&T’s scope of work was for the design, tender, construction management and commissioning of the works.
Read MoreK&T was appointed for the Jet fuel tank farm and infrastructure at the airport. The Electrical works consisted of site earthing and lighting, pump control, office building electrical works, fuel measurement & control instrumentation. K&T’s scope of work was for the design, tender, construction management and commissioning of the works.