Posts by kanteys_admin
Rehabilitation of MR348 and the Upgrade of DR1611 and DR1599 Near Glentana
The project entailed the rehabilitation of some 9 km of surfaced roads and the upgrade of the existing gravel roads to a surfaced standard. The project was located near Glentana in the Western Cape. Also included under the contract were the construction of some 7 km of surfaced sidewalks, construction of two major gabion revetment…
Read MoreHuis River Pass – Slope Remediation
The project entailed the remediation of the existing rock cut slopes and concrete catch-walls in the Huis River Pass on Route 62 between Ladismith and Calitzdorp. The work included the barring down of potentially unstable material from the existing cut slopes and the removal of the rock build-up behind the catch-walls – some 23000m 3…
Read MoreBotlierskop Flood Repairs
The project comprised flood damage repairs near Botlierskop in the Southern Cape. The road works included the construction of a concrete causeway. The river works involved the construction of groynes on the embankment of and in the Moordkuil river, river bank excavations and fill and placing of rip-rap on the riverbank slope.
Read MoreTR1/1: Malgas Reconstruction
The project involved the reconstruction and upgrading of 4,1 km of N9/N12 between George and the Outeniqua Pass in the Western Cape. The widening and raising of the Malgas river arch bridge and the diversion of a short section of the Blanco river also formed a key component of the project. Extensive provision was also…
Read MoreOuteniqua Slope Repair
The project comprised the re-instatement of the failed slope on the N9/N12 (Outeniqua Pass) near George. The work consisted of the installation of 53 augered piles with a 900mm diameter each approximately 15m in length followed by a 80m long concrete capping beam and barrier wall. A total of 27 ground anchors each 20m in…
Read MoreWalvis Bay Depot Project Namibia
Install new pumps in new pump bay (2 x road for ULP, 2 x road for 500ppm diesel and 2 x Road for Diesel 50, 2000l/min each). Install new discharge piping from new pump bay to new road gantry for each product. Install new loading equipment (2 x bays only) in the new road gantry.…
Read MoreLumwana Mine Depot Project Zambia
Construction of road receipt facilities, consisting of concrete spill slab, structural steel gantry with high level fall protection and canopy roof to cater for receipt of diesel and 2x lube oils. Construction of tankage and bunds to cater for 2x 500cu.m diesel tanks and 2x 46cu.m lube oil tanks, including associated fixed and mobile fire…
Read MoreKansanshi Mine Depot Project Zambia
Construction of 2 road receipt facilities servicing diesel and lube oils, which consists of concrete spill slab, structural steel gantry with high level fall protection and canopy roof. Construction of 5 bay HME loading facilities for diesel and lube oils, consisting of concrete spill slab, structural steel gantry and canopy roof. Construction of 2 bay…
Read MoreKalumbila Mine Depot Project Zambia
Construction of 3 bay road receipt facility for diesel and lube oils, which consists of concrete spill slab, structural steel gantry with high level fall protection and canopy roof. Construction of a 3 bay HME loading facility for diesel and lube oils, consisting of concrete spill slab, structural steel gantry and canopy roof. Construction of…
Read MoreUpgraded Fire Fighting System Durban Harbour
Upgrading of foam pumps and injection system. This work included the removal of all pipework and fittings within the water and foam pump stations, replacement of all control valves, relocate the sub-station to berth side, removal of existing diesel engine for foam pumps, installation of new pipework and fittings. New cement-lined pipework, fittings and valves…
Read More